At 16 days, the aggregate expansion limit is 0.15 percent. What is the expansion limit for one year or less?

Prepare for the CSLB Concrete C-8 License 2 Exam. Use flashcards and multiple choice questions, each with hints and explanations. Get ready for your concrete licensing exam today!

Multiple Choice

At 16 days, the aggregate expansion limit is 0.15 percent. What is the expansion limit for one year or less?

Explanation:
Expansion limits for aggregate are tied to the curing period. The standard uses a stricter threshold for longer timeframes to ensure long-term stability. If the expansion is measured over a year or less, the allowable limit is 0.04%, which is more restrictive than the 16‑day limit of 0.15%. That tighter cap helps prevent significant expansion from developing within the first year of use. The other options either repeat the 16‑day limit (0.15%), are too permissive (0.40%), or too small (0.01%) compared to the established standard for a year or less.

Expansion limits for aggregate are tied to the curing period. The standard uses a stricter threshold for longer timeframes to ensure long-term stability. If the expansion is measured over a year or less, the allowable limit is 0.04%, which is more restrictive than the 16‑day limit of 0.15%. That tighter cap helps prevent significant expansion from developing within the first year of use. The other options either repeat the 16‑day limit (0.15%), are too permissive (0.40%), or too small (0.01%) compared to the established standard for a year or less.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy